Erosion tip · 2026-10-15
Inlet protection proof when the city cites the GC
Catch basin and curb inlet photos tied to service day.
Yard tip · 5 min read
Save time and money on this job
- Time: SWPP photos timestamped before the inspector walk.
- Money: Stop-work and rework on silt failures cost more than proof fees.
- Habit: Line set and inlet shots every install run.
Inlet protection disputes are timeline disputes. Show what you maintained on the day you serviced, not a camera roll from three jobs mixed together.
Erosion lane debits match surface stakes: cheap enough for repeat sweeps, detailed enough for email defense.
Customer send on finish puts your clock next to the citation date.
Erosion lane documents SWPP and silt before inspectors or storms argue.
Not legal advice. FieldDrop is documentation tooling only. Linked cases are public sources; outcomes depend on facts and jurisdiction. Read the original opinions before relying on them.