Erosion tip · 2026-10-15

How to document erosion jobs in under five minutes

SWPP clear. · You document silt fence and inlet protection before the inspector arrives.

Yard tip · 5 min read

Save time and money on this job

  • Time: SWPP photos timestamped before the inspector walk.
  • Money: Stop-work and rework on silt failures cost more than proof fees.
  • Habit: Line set and inlet shots every install run.

Small vendors in the erosion lane lose hours replaying phone tag. A timestamped proof packet when the driver finishes ends most fights before they start.

FieldDrop shapes job steps for FieldDrop Erosion: same wallet as the rest of the yard, lane rate debits on finish the job, customer gets a link without your dispatch login.

One defended claim on a erosion job pays for years of per-stop fees. This tip series keeps drivers on one checklist so you are not rebuilding proof from a camera roll.

Erosion lane documents SWPP and silt before inspectors or storms argue.