Erosion tip · 2026-10-15
How to document erosion jobs in under five minutes
SWPP clear. · You document silt fence and inlet protection before the inspector arrives.
Yard tip · 5 min read
Save time and money on this job
- Time: SWPP photos timestamped before the inspector walk.
- Money: Stop-work and rework on silt failures cost more than proof fees.
- Habit: Line set and inlet shots every install run.
Small vendors in the erosion lane lose hours replaying phone tag. A timestamped proof packet when the driver finishes ends most fights before they start.
FieldDrop shapes job steps for FieldDrop Erosion: same wallet as the rest of the yard, lane rate debits on finish the job, customer gets a link without your dispatch login.
One defended claim on a erosion job pays for years of per-stop fees. This tip series keeps drivers on one checklist so you are not rebuilding proof from a camera roll.
Erosion lane documents SWPP and silt before inspectors or storms argue.
Not legal advice. FieldDrop is documentation tooling only. Linked cases are public sources; outcomes depend on facts and jurisdiction. Read the original opinions before relying on them.